Duration, control, and success factors of Nigerian public infrastructure projects

Ezeoke, G C (2021) Duration, control, and success factors of Nigerian public infrastructure projects. PhD thesis, Walden University, USA.

Abstract

In Nigeria, many infrastructural projects are abandoned before completion, representing a failure on the part of the federal, state, and local governments. There is currently an incomplete understanding of the interwoven causes of Nigerian public project failures. The purpose of this quantitative correlation research was to evaluate the relationships between project duration, control, and success. Project and control theories were the theoretical underpinnings of the study. The two predictor variables were project duration and project control, with the criterion variable being project success. A survey was administered to 74 project management professionals, construction workers, and other stakeholders in the Nigerian building and construction industry, who were recruited using convenience sampling. The questionnaire, which was hosted on Survey Monkey, included demographic items and questions about the duration, success, and management control of the last public project in Nigeria the participant managed or led. Use of the multiple regression model for data analysis led to the findings in this study. Findings showed a statistically significant positive correlation between project management control and project success. Project duration (as measured in months) was not a significant predictor of project success. The findings show that project control is a fundamental aspect of project success; as such, project leaders should focus on the type and quality of contractors or project bidders as well as emphasize overall project efficiency. By improving professional practices, stakeholders may be able to reduce the number of failed projects and enhance public project success in Nigeria, which may promote economic development and community and citizenry welfare.

Item Type: Thesis (Doctoral)
Thesis advisor: Rick, H
Uncontrolled Keywords: duration; economic development; failure; government; infrastructure project; local government; project control; project success; public infrastructure; construction worker; professional; stakeholder; Nigeria; multiple regression; regression model
Index terms: data analysis, bidder, sampling, economic development, public infrastructure, regression model, multiple regression model, Nigeria, questionnaire, infrastructure project, public project, duration, project management, multiple-regression, infrastructural project, project control, professional practice, survey, project success, local government, construction worker, success factor, construction industry, efficiency
Subjects: control systems, data collection methods, project controls, economic development, Geography, infrastructure and transport systems, professional development, infrastructure engineering, bidding, practitioner, performance management, project management theory and practice, industry analysis, administrative law, data analysis and analytics, statistical analysis, health monitoring assessment and metrics
Topics: Time Control, Research Practice, Information Management, Geographical Context, Sustainability, Legal Issues, Health and Safety, Engineering Principles, Procurement, Roles and Professions, Quality Management, Project Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here