Incentivizing effort in highly collaborative construction and design teams

Mulholland, S M (2021) Incentivizing effort in highly collaborative construction and design teams. PhD thesis, University of Colorado at Denver, USA.

Abstract

The commercial construction industry has been experiencing a transition to project types that promote increased collaboration between designers and contractors, such as integrated project delivery and design-build. The project performance of these highly collaborative projects appears to be greater than that of traditional project types, such as design-bid-build. Collaboration can be challenging though, as the contracted collaborators can provide varying levels of needed effort. Thus, promoting and monitoring the collaborative effort of project participants is of value to the project owner and project participant alike. However, there is a lack of guidance regarding how to promote efficient and effective effort from project team members. Traditional construction and design projects (Lump Sum/Hard Bid, for example) utilize procurement and contracting methods that incentivize individual profit maximization over project success. Rational contracted parties are forced to balance collaboration with the need to maximize profits. If collaboration comes at a cost, and profit realization is not guaranteed, the rational party must act in self-interest over that of the project. These self-interested actions may or may not degrade project outcomes. This focus on self-interest contrasts with highly collaborative projects where the contractual intent is to incentivize “collaborative effort” of the project team. Unfortunately, there is little guidance regarding what “collaborative effort” means or how to measure it. The following research examines the measurement of collaborative effort, the contractual implications, and incentives structures of “collaborative effort”, and the association “collaborative effort” to project outcomes.

Item Type: Thesis (Doctoral)
Thesis advisor: Clevenger, C
Uncontrolled Keywords: contracting methods; measurement; profit maximization; project team; collaboration; integrated project delivery; monitoring; project delivery; project success; designer; owner; project performance
Index terms: profit, maximization, integrated project delivery, design team, contracting method, collaboration, design-bid-build, project outcome, designer, commercial construction, owner, traditional construction, project success, project team, project delivery, project performance, collaborative project, monitoring
Subjects: heritage and conservation, algorithms, economic analysis, professional practice, contractual arrangements, project completion, construction type, sociology, management, project management theory and practice, project delivery, profession, control systems
Topics: Procurement, Project Management, Site Management, Organizational Design, Design Practice, Digital Applications, Construction Technology, Roles and Professions, Stakeholder Management, Business Strategy
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here