A predictive model for reducing cost and time for the detection of clashes in residential and commercial constructions projects

Tonimoghadam, F (2021) A predictive model for reducing cost and time for the detection of clashes in residential and commercial constructions projects. DEng thesis, George Washington University, USA.

Abstract

A predictive model for reducing cost time for the detection of clashes in residential and commercial constructions projects This praxis introduces a predictive model that optimizes the clash detection process by applying a machine learning technique to reduce the cost and time for the detection of clashes in building projects. The success of projects and quality of decisions depends on efficient coordination among different professional teams during the design phase of a construction project and on discovering the clashes at an early stage. This clash detection process will be based on the Building Information Model (BIM) implemented in 3D design review software, such as Navisworks, to make the detection and disposition of clashes more efficient. Detection and analysis of many types of clashes in predictive models will help BIM managers find the relevant clashes automatically and more accurately without spending time detecting them manually. Detected clashes from previous and current projects are used as input data to the machine learning models to detect clashes in data from new projects.

Item Type: Thesis (Doctoral)
Thesis advisor: Fossaceca, J and Sarkani, S
Uncontrolled Keywords: coordination; residential; construction project; building information model; learning; professional; machine learning
Index terms: manager, machine learning, construction project, commercial construction, coordination, praxis, design phase
Subjects: management, artificial intelligence, reflexivity, production management, professional practice, construction type, practitioner
Topics: Project Management, Construction Technology, Roles and Professions, Research Practice, Organizational Design, Digital Applications, Design Practice
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here