The consideration of maintenance issues during the design process in the UK public sector

Williamson, A; Williams, C and Gameson, R (2010) The consideration of maintenance issues during the design process in the UK public sector. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Abstract

Maintenance is always required on buildings, for which budgets need to be allocated by building owners, particularly when the buildings are relatively old. However, building maintenance managers do not expect to be having to allocate excessive budgets to buildings which are suffering maintenance problems early in their life span. The aim of the research was to measure practitioners' experiences and opinions as to whether three techniques (value management [VM], whole life costing [WLC] and the Design Quality Indicator [DQI]) could be effectively utilized during the design stage of new building projects to prevent or reduce premature and unnecessary future building maintenance. The research method involved a postal questionnaire survey of a sample of UK local authority maintenance managers and architects from which 54 valid responses were obtained. Quantitative data were analysed using descriptive statistics and qualitative data, in the form of respondents' comments to some questionnaire questions, were content analysed. The results of the research show significant differences between the current utilization of the three techniques and the survey respondents' evaluation of their future potential use to reduce further, unnecessary, building maintenance. The research findings support the dilemma often faced in the public sector between the funding of new building projects from capital finances, and the funding of running and maintenance costs from revenue budgets. The research concludes that a gap exists between the current use of the three techniques and practitioners' opinions of a significantly higher use in the future. The research impact is a greater understanding of the consideration and evaluation of maintenance issues during the building design process by using analytical techniques.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: building maintenance; design quality indicator; value management; whole life costing
Index terms: value management, practitioner, architect, design stage, questionnaire, funding, maintenance cost, whole-life costing, statistics, design process, building maintenance, manager, building design, survey, revenue, design quality indicator, public sector, owner, local authority
Subjects: practitioner, design methods, mathematical modelling, profession, construction type, data collection methods, architectural design, economic analysis, professional practice, management, financial management, administrative law, occupational health, sociology
Topics: Legal Issues, Design Practice, Value Management, Roles and Professions, Stakeholder Management, Construction Technology, Health and Safety, Business Strategy, Research Practice
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here