Impact of stress on injury incidents among construction workers

Chan, I Y S and Leung, M Y (2011) Impact of stress on injury incidents among construction workers. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Abstract

The role of construction workers (CWs), as a group of indispensible, frontline project members, is essential to the success of every construction project. But the job of CW is also recognized as a dangerous occupation. At the same time, because of the physically demanding construction work tasks, crisis-ridden site environments, and the lack of power and control over their work, CWs are 1.7 times more likely to suffer from stress than workers in other industries. Such stress not only affects worker productivity, but also safety at work. Although the relationship between stress and performance has long been validated, studies have rarely investigated that between CW stress and injury rates, which are the ultimate indicator of safety performance. The current study thus aimed to investigate the curvilinear relationships between stress and CW injury incidents. To do so, a questionnaire survey was designed and distributed to CWs in Hong Kong. Three types of stress were identified, including work stress, emotional stress, and physical stress. A structural equation model, developed based on correlation analysis results, indicated that (i) work stress had a U-shaped relationship with the CW injury incidents, (ii) emotional stress also had a U-shaped relationship with the CW injury incidents, and (iii) physical stress had a )"-shaped relationship with the same. In line with the study results, a number of recommendations are suggested for construction industry stakeholders to minimize injuries incidents among CWs through managing their stress levels appropriately.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: construction workers; emotional stress; injury incidents; physical stress; work stress
Index terms: work stress, injury, Hong Kong, survey, correlation analysis, occupation, productivity, structural equation model, construction work, questionnaire, construction project, safety performance, construction industry, construction worker
Subjects: psychology, operations management, data collection methods, practitioner, occupational health and safety management, health conditions and diseases, sociology, industry analysis, statistical analysis, management, production management, Geography
Topics: Roles and Professions, Project Management, Geographical Context, Research Practice, Business Strategy, Health and Safety
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here