Factor analysis of risk allocation criteria (rac) in public-private partnership (PPP) projects: A case of New Zealand

Rasheed, N; Shahzad, W M and Rotimi, J O B (2024) Factor analysis of risk allocation criteria (rac) in public-private partnership (PPP) projects: A case of New Zealand. Construction Economics and Building, 24(4-5), pp. 142-159. ISSN 2204-9029

Abstract

The utilization of Public Private Partnerships (PPPs) has become widely prevalent as an innovative approach for procuring public infrastructure projects. Risk transfer/allocation is one of the main reasons for this widespread adoption and considered a critical success factor for a PPP. Given the importance of equitable risk allocation, this study identified and analysed 10 key risk allocation criteria. Experts with experience in PPP projects in New Zealand were surveyed through an empirical questionnaire to obtain industry-wide data. Mean score analysis and factor analysis were then used to analyse the collected data. In order to ensure the validity of the analysis results, appropriate statistical tests such as Cronbach's Alpha, Kaiser-Meyer-Olkin (KMO) statistic and Bartlett's test of Sphericity were conducted. Result indicate that the most important criteria for risk allocation are "risk foresight", "minimize risk loss" and "response to risk". Furthermore, factor analysis showed that the identified RAC can be classified into three component groups namely "risk management expertise", "core risk management capability" and "risk management strategy". This study aims to provide PPP stakeholders with useful insights into the most effective measures for achieving equitable risk allocation. To achieve this, the study recommends to consider the risk management capabilities of both the public and private sectors in light of the identified RACs/groupings. The results of the study are expected to assist PPP stakeholders in developing strategies that can enhance risk management and achieve a fair distribution of risks.

Item Type: Article
Uncontrolled Keywords: factor analysis; public-private-partnerships; risk allocation criteria; risk management; questionnaire survey
Index terms: survey, strategy, statistical test, critical success factor, questionnaire, validity, partnership, private sector, public infrastructure, New Zealand, public private partnership, risk allocation, factor analysis, risk management
Subjects: statistical analysis, industry analysis, infrastructure and transport systems, partnership management, management, control systems, risk assessment, data collection methods, financial risk, Geography, contractual arrangements, evaluation and assessment methods
Topics: Procurement, Risk Management, Engineering Principles, Project Management, Geographical Context, Stakeholder Management, Research Practice, Cost Management, Business Strategy
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here