A claim-based risk mapping of contractor's all-risk insurance in Indonesia

Pramudya, A A; Wibowo, A; Santosa, W and Permana, F J (2025) A claim-based risk mapping of contractor's all-risk insurance in Indonesia. Construction Economics and Building, 25(1), pp. 122-142. ISSN 2204-9029

Abstract

Contractor's all-risk (CAR) insurance is widely used in construction. Although it constitutes a small fraction of the global insurance sector, it records higher claims than other types of insurance. Therefore, identifying the root cause or origin of potential losses is pivotal. This study aims to map CAR insurance risks based on historical data from the policies and claims of two major Indonesian insurance firms. This study employed descriptive statistics to summarize the frequency and characteristics of claim values for each risk and the Mann–Whitney and Kruskal–Wallis tests to determine significant differences in claim values among several attributes. The Shapiro–Wilk test was used to assess data normality. Of the 76 identified risks based on previous studies, 15 led to CAR claims, with six risks accounting for 77% of the overall claim values. Most risks causing substantial claims are attributed to natural and man-made disasters. While the geographical area (Java and outside Java island) emerged as a determining factor in claim values, no significant differences in normalized claim values were found for different stages of work progress (<25%, 25% to 50%, >50% to 75%, >75%) or types of construction projects (infrastructure, building, and industrial). This study acknowledges the limitations arising from the incompleteness of the data. Despite these limitations, this study can pave the way for further research, such as examining the influence of project characteristics on the likelihood of claims and quantifying these characteristics to help calculate the premium value of CAR insurance.

Item Type: Article
Uncontrolled Keywords: claim; contractor's all-risk insurance; frequency; Indonesia; severity
Index terms: Indonesia, statistics, insurance, accounting, construction project, mapping
Subjects: economic analysis, spatial and geospatial analysis, Geography, production management, mathematical modelling
Topics: Project Management, Geographical Context, Research Practice, Business Strategy
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here