A novel approach for construction disputes causal inferences based on empirical data: A case-controlled method combined with Bradford Hill criteria

Wang, P; Fenn, P and Wang, K (2024) A novel approach for construction disputes causal inferences based on empirical data: A case-controlled method combined with Bradford Hill criteria. Engineering, Construction and Architectural Management, 31(11), pp. 4625-4644. ISSN 0969-9988

Abstract

Purpose: This paper aims to devise a case-controlled method combined with Bradford Hill criteria for causal inference of contractual disputes in construction projects. It is a genuine attempt in a systematic method from research design to execution for causal issues where only observational data is available. Design/methodology/approach: The authors located insufficient top management support as the putative pathogen of construction disputes based on a literature review, an interview and Delphi surveys. A questionnaire survey was then conducted to collect case-controlled data to ensure comparability, in which for each disputed project put in the experimental group, the authors sought for a dispute-free project of similar characteristics. The incidence rates of insufficient top management support in the experimental and control groups were then examined by Bradford Hill criteria as an alternative to the test of intervention effect. Findings: The association of insufficient top management support and construction disputes was tested to conform with the Bradford Hill criteria with case-controlled data where applicable and logical deduction where statistical tests were not applicable. With a clear, positive, reasonable and statistically significant association, while excluding methodological biases, confounding and chance, the authors reached a causal verdict of insufficient top management support causing contractual disputes. Originality/value: This paper supports the validity of applying a case-controlled method combined with Bradford Hill criteria in investigating causal issues in project management, especially the verdict of causal inference based on empirical data. In addition, the located root cause of contractual disputes could inform project management personnel with reasoned strategies for dispute avoidance.

Item Type: Article
Uncontrolled Keywords: Bradford Hill criteria; case-controlled method; causal inference; construction disputes; novel method; questionnaire survey
Index terms: survey, literature review, strategy, interview, personnel, statistical test, questionnaire, construction project, top management, methodology, bias, validity, dispute, research design, Delphi survey, project management, construction dispute, pathogen
Subjects: management, health risk and incident analysis, probability and distributions, project management theory and practice, statistical analysis, research design and methodology, data collection methods, dispute resolution, data analysis and analytics, research methods, production management, evaluation and assessment methods
Topics: Human Resources, Organizational Design, Business Strategy, Research Practice, Legal Issues, Health and Safety, Project Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here