Abstract
Purpose: The building commissioning (BCx) phase is a critical stage in a building's lifecycle. It is also a complex process that involves a large number of actors and activities. While the use of building information modeling (BIM) in the commissioning phase of building equipment and systems could be beneficial, few studies have investigated the processes behind its implementation. The research presented in this paper aims to investigate the implementation of BIM for the commissioning phase within a general contracting company through action-research. Design/methodology/approach: Through direct involvement with the research partner, a large general contractor, a diagnosis on the current limitations of the commissioning process was conducted. An action plan to implement BIM for commissioning was developed and implemented in two pilot projects. Evaluation was performed through on-site observations and informal discussions with field staff. Learning was specified through the development of a formal protocol for BIM-enabled BCx. Findings: This action-research project helped the partner organization identify the challenges and a way forward to formalize its BIM-enabled BCx process. The action plan aimed at countering the lack of knowledge about the status of equipment and system commissioning as well as the lack of standardization. The research team co-developed and tested a formal protocol, including BIM-enabled processes and technologies to address these observed problems. A complete implementation ecosystem was structured and deployed. Preliminary feedback indicated that improvements were obtained using a BIM-enabled approach over a traditional approach. Originality/value: While past studies have investigated the BCx process, this study identified current challenges considering recent advances in BIM and focused on a large general contractor. This work provides an in-depth account of a large general contractor attempting to streamline its BCx process. The results of the study could help guide practitioners in implementing more streamlined BIM-enabled BCx processes.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | BIM; enhanced commissioning; equipment; new information and communication technologies; systems |
| Index terms: | implementation, lifecycle, standardization, building information modelling, commissioning, practitioner, methodology, general contractor, information and communication technology |
| Subjects: | completion, research methods, contractual arrangements, practitioner, information systems, performance measurement, project delivery, computing systems |
| Topics: | Roles and Professions, Research Practice, Digital Applications, Procurement, Project Management, Quality Management |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here