Forsythe, P (2015) Monitoring customer perceived service quality and satisfaction during the construction process. Construction Economics and Building, 15(1), pp. 19-42. ISSN 2204-9029
Abstract
Service quality has been studied across many construction related disciplines but little has been done concerning how it effects customer satisfaction during the day-to-day dynamics of onsite construction services. The research explores this setting in Australian housing construction projects. A highly detailed single case study methodology was used with a view to facilitating theory development for a targeted customer type displaying service quality oriented expectations, high involvement, but low construction experience. Gaps scores for perceived service quality and customer satisfaction were systematically monitored during construction. Concurrently, interviews were used to obtain incident data linked to the scoring data. It was found that service incidents, service quality and customer satisfaction were linked at each stage of construction. Related aspects included the ratio between positive and negative incidents; a saturation point regarding negative incidents; and an end of process/product realisation factor. The importance of identifying active service quality dimensions during construction was identified (especially reliability and care in execution of work). An incident coding structure was developed whereby frequently recurring incident features included spontaneous situations, site observations, personal interaction, subcontractor involvement, progressive product quality, progressive construction activity and defensive customer action. The research recommends that construction contractors aim to control the above features by creating orchestrated incidents and controlling exposure to perceptions via fast and seamless onsite construction.Paper type: Research article
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | customer satisfaction; construction process; customer behaviour; house building; service quality |
| Index terms: | exposure, dimension, construction contractor, interaction, construction activity, subcontractor, product quality, dynamics, interview, monitoring, construction process, onsite, methodology, satisfaction, service quality, residential construction, customer satisfaction, case study |
| Subjects: | construction integration, research methods, public and environmental health, data collection methods, performance measurement, control systems, practitioner, service delivery, building construction, quality assurance, project delivery, behavioral psychology, health monitoring assessment and metrics, systems engineering, construction operations |
| Topics: | Site Management, Quality Management, Construction Technology, Roles and Professions, Stakeholder Management, Research Practice, Project Management, Engineering Principles, Business Strategy, Health and Safety |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here