Managing risks in IPD-ish projects: Experience from Hong Kong

Ma, Q; Cheung, S O and Li, S (2025) Managing risks in IPD-ish projects: Experience from Hong Kong. Engineering, Construction and Architectural Management, 32(3), pp. 1816-1836. ISSN 0969-9988

Abstract

Purpose: Integrated project delivery (IPD) project that does not use multiparty agreement is identified as IPD-ish. The use of IPD-ish arrangement by incorporating integration practices in conventional contract can be viewed as the part of the adoption process of IPD. Moreover, inappropriate integration practices invite new forms of risks and the absence of multiparty agreement adds to the challenges of risk management in IPD-ish projects. This study discusses such challenges and proposes the use of joint risk management to address the potential pitfalls in IPD-ish arrangement. Design/methodology/approach: A mixed research method was applied. First, the criticality of IPD-ish general and integration-specific risks was examined through a survey. Second, a real IPD-ish project was used to exemplify the use of joint risk management (JRM) to manage IPD-ish risks. Findings: Two types of risks, namely integration risks (IRs) and general risks (GRs), are identified in IPD-ish projects. Two major findings for the IRs: (1) the most critical IRs are related to unbalanced incentivization and inefficient multidisciplinary teams; and (2) only team formation related pre-contract JRM strategies affect IRs. As for the GRs, the most critical ones are associated with design issues and can be effectively mitigated by post-contract JRM. Originality/value: Using IPD-ish arrangement is an inevitable part of implementation of full IPD. This happens as many change-averse owners would like to test the integration principles using a conventional contract that they are familiar with. In fact, success in IPD-ish would pave the path for further adoption of IPD. This study offers insight into categorization of risks in IPD-ish projects. Appropriate use of post-contract and organization related pre-contract JRM would improve the chance of teasing out the values of IPD through IPD-ish arrangements. Care should be taken to introduce some contracting integration initiatives, such as risk/reward sharing incentive.

Item Type: Article
Uncontrolled Keywords: Hong Kong; integrated project delivery; IPD-ish; joint risk management; project risk; questionnaire survey
Index terms: risk management, implementation, Hong Kong, owner, methodology, integration, questionnaire, incentivization, multidisciplinary team, strategy, integrated project delivery, survey
Subjects: research methods, Geography, contractual arrangements, management, organizational analysis, sociology, data collection methods, risk assessment
Topics: Geographical Context, Risk Management, Procurement, Organizational Design, Business Strategy, Research Practice, Stakeholder Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here