Systemic rework risk classification for offshore projects

Love, P; Smith, J and Han, S (2011) Systemic rework risk classification for offshore projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Abstract

Rework arises due to errors and omissions, and significantly contributes to project cost and schedule overruns in offshore projects. To acquire an understanding of the causal nature of rework in offshore projects, twenty three in-depth interviews with leading oil and gas industry practitioners were undertaken. The dialogue and narratives obtained from the interviews enabled the underlying dynamics of rework to be determined. A risk classification matrix is developed that can be utilized as a frame of reference to mitigate future rework. If rework risks are not given due consideration then there is the potential for latent conditions to become embedded within organizational and project systems and processes. Consequently, the likelihood of failures, accidents or even catastrophes increases.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: dynamics; errors; offshore projects; rework; risk
Index terms: oil and gas, narrative, dynamics, practitioner, rework, schedule overrun, project cost, interview
Subjects: operations management, practitioner, data collection methods, industry analysis, systems engineering, project controls, qualitative and interpretive research, economics
Topics: Time Control, Roles and Professions, Cost Management, Project Management, Research Practice, Engineering Principles
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here