An evaluation method for multisource information fusion in tunneling water inrush disasters

Qiu, W; Ma, P; Peng, Q; Zhao, L; Liu, L and Zhou, F (2024) An evaluation method for multisource information fusion in tunneling water inrush disasters. Journal of Construction Engineering and Management, 150(10): 04024133, ISSN 0733-9364

Abstract

During tunnel construction, a substantial volume of data is generated. However, presently, there is a challenge in effectively integrating those data to conduct a precise risk assessment of water inrush. This study develops a novel multisource information fusion method that merges a probabilistic support vector machine, cloud model, evidential reasoning (ER) rule, and Monte Carlo (MC) simulation method to support water-inrush risk assessment under uncertainty. Different models train a variety of information sources to analyze the water-inrush risk value. The evaluation of each model's judgment is based on its performance, which is determined by its reliability and the significance of its weights. Finally, these multiple assessment results are fused at the decision level to achieve an overall water-inrush risk evaluation using the ER rule. The MC simulation method was used to model the uncertainty and randomness underlying the limited number of observations. The Heshan tunnel case in China is used to demonstrate the feasibility and effectiveness of the developed method. The outcomes suggest that the multisource information fusion technique proposed is capable of (1) demonstrating a good ability to handle high conflict information; (2) exhibiting an outstanding assessment performance (90% accuracy) compared to that of single-source assessment models (lower than 70% accuracy); and (3) performing strongly with bias, as it can achieve acceptable assessment accuracy under 5% bias. Therefore, the newly proposed method for fusing multiple sources of information can serve as a practical reference for water-inrush risk assessment and management.

Item Type: Article
Uncontrolled Keywords: cloud model; evidential reasoning rule; risk assessment; support vector machine; water inrush
Index terms: risk assessment, bias, accuracy, judgment, effectiveness, reasoning, tunnel, tunnel construction, China
Subjects: financial risk, probability and distributions, infrastructure and transport systems, professional development, Geography, cognitive psychology, performance management, civil engineering, dispute resolution
Topics: Information Management, Quality Management, Research Practice, Legal Issues, Geographical Context, Engineering Principles, Cost Management
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here