Enhanced highway project clustering framework to support project cost estimation

Do, Q; Moriyani, M A; Le, T; Le, C and Piratla, K (2025) Enhanced highway project clustering framework to support project cost estimation. Journal of Construction Engineering and Management, 151(1): 04024191, ISSN 0733-9364

Abstract

State highway agencies (SHAs) frequently need to cluster projects based on their scope similarity to support various construction planning tasks such as cost estimation. Few recent studies have presented systematic methods that employ cost composition and pay item descriptions for automated project clustering. However, they suffer from two main drawbacks, including the reliance on unit bid prices, which are unavailable at the time cost estimation is conducted, and the lack of thorough validation of their effectiveness in supporting cost estimation. To address these limitations, this study presents a novel quantity-weighted term frequency-inverse document frequency (QW-TFIDF) project vectorization method using both the text description and quantity information of pay items. QW-TFIDF was validated in terms of its effectiveness in supporting project clustering and cost estimating. Its performance was compared with state-of-the-art approaches, including cost-weighted term frequency-inverse document frequency (CW-TF-IDF) and pay item cost-based similarity determination methods. The results showcased the superiority of the new method over existing ones, thus providing a new means for SHAs to enhance their project clustering practices, particularly in early-stage cost estimation, which in turn, will facilitate better budget forecasting, cost management, and resource allocation.

Item Type: Article
Uncontrolled Keywords: cost estimation; natural language processing; project clustering; project similarity; term frequency-inverse document frequency
Index terms: project cost, clustering, construction planning, highway construction, cost management, state of the art, effectiveness, agency, forecasting, resource allocation, cost estimating, estimation, validation
Subjects: performance management, prediction and forecasting, accounting and finance, civil engineering, professional development, resource management, financial and cost management, data science, sociology, economics, construction planning, research dissemination and communication
Topics: Research Practice, Engineering Principles, Information Management, Digital Applications, Cost Management, Quality Management, Site Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here