Enhancing the production performance of prefabricated buildings through the integrated optimization of precast component layout and worker allocation

Yuan, Z; Li, Z; Lei, Z; Yang, Y; Zhang, W; Lin, W and Cao, L (2025) Enhancing the production performance of prefabricated buildings through the integrated optimization of precast component layout and worker allocation. Journal of Construction Engineering and Management, 151(2): 04024200, ISSN 0733-9364

Abstract

The layout of precast components (PCs) made of concrete materials on movable mold tables not only affects the number of movable mold tables but also impacts worker allocation during production. However, previous studies, to our best knowledge, have not yet considered the optimal precast component (PC) layout when optimizing worker allocation, potentially leading to more time, costs, and carbon dioxide (CO2) emissions during production. As such, this study proposes a method for optimizing the PC layout on movable mold tables and worker allocation during production from the perspective of multiobjective trade-offs. This method has the following characteristics: (1) the Pareto optimality (PO) principle is adopted to address the trade-offs between multiple objectives, while discrete event simulation (DES) technology is used to simulate the production process of PCs; and (2) optimizing the PC layout serves as the basis for optimizing the worker allocation. A real production case is used for demonstrating and validating this method. The results show that: (1) the method searches for two Pareto-optimal PC layout schemes on movable mold tables and reduces the sum of processing-time variance in an assembly line by 44.15% without changing the number of movable mold tables or by 89.18% with adding six movable mold tables; and (2) based on these two PC layout schemes, this method further reduces costs and CO2 emissions by 6.97% and 14.56%, respectively, during production. Thus, the method represents a pioneering and effective achievement in the integrated multiobjective trade-off optimization of PC layout and worker allocation, thereby enriching the methodological system of industrial construction and lean construction. In addition, the method, findings, and recommendations in this study facilitate factory managers' high-performance decision-making in addressing the trade-offs among time shortening, cost reduction, and CO2 emission mitigation during PC production.

Item Type: Article
Uncontrolled Keywords: mold table; optimization; precast component (PC) layout; simulation; worker allocation
Index terms: prefabricated building, production process, mitigation, assembly line, discrete event simulation, CO2 emissions, industrial construction, variance, carbon dioxide, decision-making, cost reduction, manager, lean construction
Subjects: building construction, economics, measurement and scaling, practitioner, manufacturing engineering, modelling and simulation, financial risk, climate science, air quality, decision analysis
Topics: Site Management, Cost Management, Construction Technology, Engineering Principles, Roles and Professions, Risk Management, Sustainability, Research Practice
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here