Liu, Z; Li, X; Gao, Z; Zhang, Y; Teng, Y and Wu, C (2025) A hybrid and intuitive work packaging approach with multiple task relations, general work package precedence, and BIM in modular construction. Journal of Construction Engineering and Management, 151(4): 04025019, ISSN 0733-9364
Abstract
A work package is an element of the work breakdown structure, which includes tasks, deliverables, and all necessary details for execution by a designated team. In modular construction (MC) production, effective work packaging is crucial for ensuring efficient task execution, reducing project costs, and maintaining schedules. However, existing research on work packaging primarily focuses on tasks with single precedence relationships, overlooking the complex task dependencies that can arise in MC production, such as parallel and cyclic tasks. To address this issue, this study proposes a hybrid and intuitive work packaging (HIWP) approach that allows concurrent execution of work packages and visualizes work packaging results. First, at the task level, we expand task type identification by incorporating parallel and cyclic tasks. Second, at the work package level, a heuristic algorithm was developed to optimize work package sizing under the general precedence relation (GPR), which allows work packages to overlap during execution. Finally, a web-based platform was developed by integrating building information modeling (BIM) technology. The contribution of this study contains a GPR-based work package sizing method, which allows the simultaneous execution of work packages, significantly improving the efficiency and accuracy of work packaging in MC projects. Additionally, an integrated BIM-based platform is developed to facilitate the visualization, querying, and communication of work package results. Experimental results demonstrate an 8.1% cost reduction compared with existing methods. Additionally, HIWP shows a 40% potential cost reduction in simulation experiments and provides up to five times faster response when adjusting to shortened project durations.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | building information modeling; modular construction; work package |
| Index terms: | platform, heuristic, package, building information modelling, efficiency, simulation experiment, duration, accuracy, project cost, modular construction, cost reduction, precedence relationship, visualization |
| Subjects: | contractual arrangements, operations research, digital design, building construction, risk assessment, modelling and simulation, professional development, design practice, economics, performance management, information systems, project controls |
| Topics: | Time Control, Digital Applications, Design Practice, Construction Technology, Cost Management, Information Management, Quality Management, Risk Management, Procurement |
| Descriptive scope: | 3 PCA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here