Using game theory to negotiate win-win payment terms between contractors and subcontractors

Fares, A; Elazouni, A and Al-Alawi, M (2025) Using game theory to negotiate win-win payment terms between contractors and subcontractors. Journal of Construction Engineering and Management, 151(5): 04025023, ISSN 0733-9364

Abstract

The construction business is known for its fierce competition among contractors and intensive outsourcing to subcontractors. Contractors compete for projects from owners by offering the lowest bid prices based on the lowest subcontractors' quotes. However, interactions between contractors and subcontractors are typically adversarial, with contractors imposing stringent contract terms and subcontractors raising their prices in response. This dynamic prevents both parties from achieving mutual gains and inflates overall construction costs. Consistently, subcontractors stressed the significant impact the payment terms have on the consistency of their cash flow. Thus, the demands of both parties open opportunities for mutual negotiations, wherein the contractors offer better payment terms for subcontractors in exchange for subcontractors offering subsidized quotes. However, there are limited studies modeling these interactions to demonstrate their potential to achieve win-win outcomes. To this end, this study introduces a prebidding negotiation process between contractors and subcontractors to establish win-win payment terms employing a nonzero-sum, noncooperative, and dynamic game-theory method. A case study that describes a two-party game between the contractor and one subcontractor illustrates the proposed method. The outcomes demonstrate the method's ability to significantly increase the payoff for the two parties. The results also highlight the benefits of negotiating flexible payment terms between contractors and subcontractors in reducing the overall construction costs.

Item Type: Article
Uncontrolled Keywords: cash flow; game theory; negotiation; payment terms; procurement; subcontractors
Index terms: negotiation, interaction, modelling, outsourcing, contract term, case study, construction cost, owner, competition, negotiating, subcontractor, cash flow, game theory
Subjects: analytical methods, practitioner, behavioral psychology, market analysis, financial and cost management, decision models, business, data collection methods, sociology, conflict resolution, contractual condition, financial management
Topics: Contract Administration, Stakeholder Management, Roles and Professions, Cost Management, Research Practice, Procurement, Engineering Principles
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here