Deepa, G; Niranjana, A J and Balu, A S (2025) A hybrid machine learning approach for early cost estimation of pile foundations. Journal of Engineering, Design and Technology, 23(1), pp. 306-322. ISSN 1726-0531
Abstract
Purpose: This study aims at proposing a hybrid model for early cost prediction of a construction project. Early cost prediction for a construction project is the basic approach to procure a project within a predefined budget. However, most of the projects routinely face the impact of cost overruns. Furthermore, conventional and manual cost computing techniques are hectic, time-consuming and error-prone. To deal with such challenges, soft computing techniques such as artificial neural networks (ANNs), fuzzy logic and genetic algorithms are applied in construction management. Each technique has its own constraints not only in terms of efficiency but also in terms of feasibility, practicability, reliability and environmental impacts. However, appropriate combination of the techniques improves the model owing to their inherent nature. Design/methodology/approach: This paper proposes a hybrid model by combining machine learning (ML) techniques with ANN to accurately predict the cost of pile foundations. The parameters contributing toward the cost of pile foundations were collected from five different projects in India. Out of 180 collected data entries, 176 entries were finally used after data cleaning. About 70% of the final data were used for building the model and the remaining 30% were used for validation. Findings: The proposed model is capable of predicting the pile foundation costs with an accuracy of 97.42%. Originality/value: Although various cost estimation techniques are available, appropriate use and combination of various ML techniques aid in improving the prediction accuracy. The proposed model will be a value addition to cost estimation of pile foundations.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | artificial neural network; construction management; cost prediction; data mining; machine learning |
| Index terms: | India, cleaning, cost overrun, efficiency, data mining, cost prediction, fuzzy logic, machine learning, methodology, construction project, computing, environmental impact, validation, face, accuracy, pile foundation, artificial neural network, genetic algorithm, cost estimating |
| Subjects: | financial and cost management, data science, artificial intelligence, modelling and simulation, computing systems, professional development, performance management, psychology, environmental impact, production management, Geography, research methods, maintenance engineering, algorithms, structural engineering |
| Topics: | Quality Management, Sustainability, Engineering Principles, Project Management, Geographical Context, Organizational Design, Digital Applications, Cost Management, Business Strategy, Information Management, Research Practice |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here