Shukor, A S A; Mohammad, M F; Mahbub, R and Ismail, F (2011) Supply chain integration challenges in project procurement in Malaysia: The perspective of IBS manufacturers. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Abstract
Industrialised Building System (IBS) involves relationships between various organizations, with the evolution of many specialised roles and embedded relationships. A good supply chain integration practice will lead to good integration among players. However, the fragmentation and adversarial relationship scenario in the IBS Malaysian construction industry leaves supply chain players with noticeable difficulties in terms of competitiveness and efficiency in integration. Although efforts have been undertaken to enhance the IBS practice in Malaysia, establishing integration between IBS players is still a major hindrance due to the lack of supply chain procurement practices. To realise the government s aspiration to transform the Malaysian construction industry into a modern construction system, and to realise the implementation of the IBS Roadmap and Construction Industry Master Plan 2006 2015, a good supply chain integration approach should be fully established. The purpose of this research is to identify the challenges of IBS supply chain integration as regards the existing project procurement they currently undertake. The methodologies are based on a thorough literature review and on the qualitative method using semi-structured interviews, which were conducted among IBS manufacturers in Malaysia. Communication and information, specifically, lack of planning and early involvement, financial matters, knowledge and understanding, risk liability, and attitude and relationship are among the challenge factors that hinder the successful integration among IBS players. These challenge factors require considerable attention in the process of pursuing greater integration within supply chains in the Malaysian construction industry. The findings will assist in pursuing greater integration and collaboration within the supply chains, and improving IBS project delivery in the Malaysian construction industry.
| Item Type: | Conference Paper (Paper) |
|---|---|
| Uncontrolled Keywords: | industrialised building system; integration; procurement; supply chain |
| Index terms: | qualitative method, industrialized building system, fragmentation, literature review, liability, efficiency, Malaysia, manufacturer, interview, project delivery, construction system, project procurement, supply chain integration, construction industry, implementation, competitiveness, methodology, evolution, integration, collaboration |
| Subjects: | research design and methodology, business, data collection methods, practitioner, project delivery, environmental science, supply chain integration, data analysis and analytics, contractual arrangements, performance management, research methods, management, Geography, building construction, market analysis, organizational analysis, liability law, industry analysis |
| Topics: | Research Practice, Geographical Context, Engineering Principles, Construction Technology, Procurement, Sustainability, Roles and Professions, Quality Management, Supply Chain Management, Legal Issues, Organizational Design |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here