Factors that affect the productivity of construction projects in small and medium companies: Analysis of its impact on planning

Valverde-Gascueña, N; Navarro-Astor, E; Fuentes-del-Burgo, J and Ruiz-Fernandez, J P (2011) Factors that affect the productivity of construction projects in small and medium companies: Analysis of its impact on planning. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Abstract

The study of productivity in the construction industry is gaining importance due to its positive effects on the economy of the construction companies and of the country as a whole. Nowadays, improving the productivity of building projects may have a direct impact in the survival of companies because of the great rivalry existing between them. In this paper we present the results of a research about the factors that impact the performance of construction works and, therefore, the planning and the building costs. Some of the considered factors such as technical faults in project documents, inspection delays or the workers training and skills are included in a survey directed to building engineers working for small and medium building companies. The knowledge and appropriate management of these factors can improve the planning of the work during the project development phase and the execution phase. This will have positive effects regarding time shortening for the execution of activities and, as a result, cost reductions.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: building performance; construction planning; productivity; project management; SME
Index terms: survey, construction company, inspection, building performance, productivity, engineer, cost reduction, survival, construction planning, project management, construction industry, project development, documents, construction work, construction project
Subjects: quality assurance, industry analysis, economics, management, professional development, project management theory and practice, production management, operations management, project delivery, construction planning, environmental science, organization, data collection methods, profession
Topics: Project Management, Research Practice, Information Management, Cost Management, Business Strategy, Sustainability, Roles and Professions, Quality Management, Site Management
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here