Building information modelling implementation plans: A comparative analysis

Ahmad, M A; Demian, P and Price, A D F (2012) Building information modelling implementation plans: A comparative analysis. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Abstract

To realize the benefits of BIM in construction management using (4D and 5D applications), it has to be implemented first. There are various BIM implementation plans to select from; with BIM features and guides, companies better understand BIM concepts and can easily choose a plan to apply in their operations. A literature review was conducted and 15 different definitions of BIM were encountered. Twelve different BIM implementation plans were found in publications by academics, software vendors and Architecture/Engineering/Construction (AEC) industry professionals. Those implementation plans were compared using a matrix which covers the complete building lifecycle. This research concludes that out of the 12 implementations plans, three were equipped with additional guides attached to their plans, simplifying project data collection; namely those by Autodesk, Penn State University and Indiana University. One implementation plan that scored very highly (based on 16 key issues identified from the three categories of stakeholders specified in this project) was the implementation plan proposed by a major software vendor. BIM is poised to solve many of the shortcomings reported in the construction industry. However, before realizing the full potential of BIM in construction management, it needs to be systematically implemented.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: implementation plans; BIM; construction management
Index terms: publication, construction industry, implementation, lifecycle, comparative analysis, literature review, project data, building information modelling
Subjects: project delivery, data analysis and analytics, contractual arrangements, data collection methods, research dissemination and communication, information systems, industry analysis
Topics: Procurement, Research Practice, Project Management, Information Management, Digital Applications
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here