A conceptual model for construction supply chain management implementation

Aloini, D; Dulmin, R; Mininno, V and Ponticelli, S (2012) A conceptual model for construction supply chain management implementation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Abstract

During the last two decades, both researchers and governmental studies revealed an increased interest about Construction Supply Chain Management (CSCM), but up to now practitioners are still facing difficulty to improve business performance through such approach. A call for ad-hoc solutions that foster the effective implementation of SCM practices has clearly risen up. This working paper is part of a wider research project which aims to provide academics and practitioners with a valuable support in this direction. We propose an integrated conceptual model to enhance the implementation of CSCM from a contingent view. The research to date includes an extensive and systematic literature review that assesses the main building elements related to SCM introduction. Such elements include: the antecedents, or prerequisites; the approaches, which involve the interrelation of strategies, structure and practices; the benefits related to an effective SCM adoption; and the contextual and environmental variables. Main implications for academics concern the analysis of extant CSCM literature from an innovative and integrated perspective, in order to highlight actual research gaps and future research agenda. At this research stage, other important goals include the advancement of useful and challenging research questions and hypothesis, with the aim to collect relevant feedback about the suitability of both the model and the research strategy.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: antecedents; conceptual model; contingent approach; supply chain management
Index terms: integrated conceptual model, practitioner, strategy, research agenda, business performance, construction supply chain, systematic literature review, suitability, implementation
Subjects: design criteria, contractual arrangements, research evaluation and metrics, construction logistics, performance measurement, practitioner, management, research management, professional development
Topics: Business Strategy, Procurement, Information Management, Supply Chain Management, Design Practice, Roles and Professions, Research Practice, Quality Management
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here