Cost analysis methodology for advanced treatment of stormwater: The Los Angeles case

Moore, J E; Kuprenas, J; Lee, J J; Gordon, P; Richardson, H and Pan, Q (2004) Cost analysis methodology for advanced treatment of stormwater: The Los Angeles case. Journal of Construction Research, 5(2), pp. 149-170. ISSN 1609-9451

Abstract

Cities in the United States can expect to be affected by proposed stringent stormwater treatment plans and standards set to be triggered by existing Federal policy-making requirements. In Los Angeles, these standards require three levels of treatment of all stormwater before it is discharged into a public body of water. This work presents a methodology for conceptual cost budgeting for these new required treatments, and describes methodologies and cost modeling tools needed for assessment of city and regional economic impacts associated with construction and operation of these plants. The research is case-study based, and presents nine different cost analysis scenarios based on different strategies for determination of rainfall, locations of plants, and size of plants. The cost and size of the new collection and treatment facilities increases substantially if they are designed to accommodate a larger share of expected annual rain events. It will cost about six times more to build a system that can treat storm flows from 97% of the region's annual average storm days than it would to build to a 70% sta additional cost achieves about nine additional days of storm flow coverage. In addition, if stormwater treatment facilities are financed locally and constructed over a twenty-year period, most communities in the greater Los Angeles area would experience very significant employment and net economic losses.

Item Type: Article
Uncontrolled Keywords: construction costs; cost estimates; stormwater management; hydr; infrastructure; economic impact; public policy
Index terms: United States, cost analysis, Los Angeles, rainfall, strategy, regional economic, budgeting, methodology, stormwater, economic impact, public policy, employment, construction cost, rain, cost estimate, modelling
Subjects: financial and cost management, environmental engineering, financial management, management, economic analysis, analytical methods, public policy, climate science, financial analysis, Geography, research methods
Topics: Sustainability, Geographical Context, Engineering Principles, Human Resources, Governance, Cost Management, Business Strategy, Research Practice
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here