Boothman, J C; Higham, A and Horsfall, B (2012) Attaining zero defects within building schools for the future: A realistic target or a sisyphean task? In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Abstract
Until its demise in July 2010 The Building Schools for the Future (BSF) programme represented the biggest single UK government investment in school buildings for more than 50 years. One of the key goals of the investment programme was the desire to ensure that pupils learn in High Quantity 21st-century facilities that are designed or redesigned to allow for educational transformation in historically underperforming schools who’s pupils where often enshroud in depravation and social exclusion. This represents a major challenge to those involved in the delivery of the new or refurbished schools. The paper explores the extent to which schools completed under the umbrella of BSF lived up to the government’s ideology of 'value for money' a key parameter of which is the delivery of high quality buildings. Drawing on an embedded case study methodology based around one local authority which completed nine secondary schools under the BSF funding model between 2006 and 2010. The findings portray the many challenges faced by constructors in the pursuit of zero defect construction. Critical to this, the authors argue, is the approach used by stakeholders to define and measure the presence of a 'defect'. Analysis of quantitative defect data reported in the paper suggests a large number of those defects identified related to mere cosmetic imperfections caused by inter alia the client team moving the school into the new building rather than serious defects caused by poor workmanship on behalf of the constructor. Findings from the research raise important questions about the use of 'defects' as a performance measurement for quality within the construction sector.
| Item Type: | Conference Paper (Paper) |
|---|---|
| Uncontrolled Keywords: | building defects; quality; total quality management |
| Index terms: | local authority, pupil, drawing, programme, secondary school, transformation, performance measurement, building defect, total quality management, case study, construction sector, workmanship, value-for-money, school building, funding, methodology, presence |
| Subjects: | construction type, data collection methods, business, technical documentation, environmental science, professional practice, evaluation methods, economic analysis, performance measurement, research methods, contractual condition, evaluation, project controls, educational institutions, sociology, industry analysis |
| Topics: | Business Strategy, Research Practice, Stakeholder Management, Sustainability, Construction Technology, Design Practice, Value Management, Quality Management, Education, Contract Administration, Time Control |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here