A case study to explore the synergy between HBIM and BEM for maintenance of historical buildings

Ferreira, A C F; Carmo, C S T; Cruz, A S and Faisca, R G (2025) A case study to explore the synergy between HBIM and BEM for maintenance of historical buildings. International Journal of Building Pathology and Adaptation, 43(3), pp. 302-320. ISSN 2398-4708

Abstract

Purpose: In developing countries, such as Brazil, the construction sector is consistently focused on the construction of new buildings, and there is no dissemination of the preservation, restoration and maintenance of historic buildings. Idle buildings, due to the use and lack of maintenance, present pathological manifestations, such as moisture problems that compromise specially their thermal and energy performance. With this in mind, the purpose of this work is to create a digital model using terrestrial photogrammetry and suggest retrofit interventions based on computer simulation to improve the thermal and energy performance of a historical building. Design/methodology/approach: The proposed methodology combined terrestrial photogrammetry using common smartphones and commercial software for historical buildings with building information modeling (historic building information modeling (HBIM)) and building energy modeling (BEM). The approach follows five steps: planning, site visit, data processing, data modeling and results. Also, as a case study, the School of Architecture and Urbanism of the Fluminense Federal University, built in 1888, was chosen to validate the approach. Findings: A digital map of pathological manifestations in the HBIM model was developed, and interventions considering the application of expanded polystyrene in the envelope to reduce energy consumption were outlined. From the synergy between HBIM and BEM, it was concluded that the information modeled using photogrammetry was fundamental to create the energy model, and simulations were needed to optimize the possible solutions in terms of energy consumption. Originality/value: Firstly, the work proposes a reasonable methodology to be applied in development countries without sophisticated technologies, but with acceptable precision for the study purpose. Secondly, the presented study shows that the use of HBIM for energy modeling proved to be useful to simulate possible solutions that optimize the thermal and energy performance.

Item Type: Article
Uncontrolled Keywords: BEM; energy efficiency; HBIM; pathological manifestations
Index terms: construction sector, restoration, historical building, methodology, dissemination, data processing, historic building, Brazil, computer simulation, developing country, energy modelling, energy performance, data modelling, synergy, energy consumption, energy model, information modelling, urbanism, energy efficiency, building information modelling, case study
Subjects: Geography, digital design, development economics, research methods, construction type, knowledge translation, cities and urban places, renovation and retrofit, industry analysis, information systems, partnership management, data collection methods, energy systems, data science, modelling and simulation, sustainability and energy
Topics: Sustainability, Geographical Context, Engineering Principles, Construction Technology, Stakeholder Management, Research Practice, International Construction, Urban Studies, Digital Applications
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here