How do different management control configurations influence construction safety professionals' work attitudes

Ju, C; Ning, Y and Shen, Y (2025) How do different management control configurations influence construction safety professionals' work attitudes. Engineering, Construction and Architectural Management, 32(5), pp. 2870-2889. ISSN 0969-9988

Abstract

Purpose: Safety professionals' primary job is to execute safety control measures towards frontline personnel, and previous studies focus on the effectiveness of such controls. Rare research efforts, however, have been devoted to the effectiveness of management control measures towards safety professionals themselves. This study aimed to fill up this knowledge gap by examining whether safety professionals under differing management control configurations differ in their work attitudes, including affective commitment, job satisfaction, career commitment and intention to quit. Design/methodology/approach: Drawing on a holistic view of control, five forms of management control, i.e. outcome control, process control, capability control, professional control and reinforcement, were investigated. A cross-sectional questionnaire survey targeting at construction safety professionals was conducted. The latent profile analysis approach was employed to identify how the five forms of management control are configured, i.e. identifying the distinctive patterns of control profiles. The Bolck-Croon-Hagenaars method was then used to examine whether safety professionals' work attitudes were different across the identified control profiles. Findings: Seven distinct control profiles were extracted from the sample of 475 construction safety professionals. The overall test of outcome means showed that mean levels of affective commitment, job satisfaction and intentions to quit were significantly different across the seven profiles. The largest that was also the most desirable subgroup was the high control profile (n = 161, 33.9%). The least desirable subgroups included the low control profile (n = 75, 15.8%) and the low capability and professional control profile (n = 12, 2.5%). Pairwise comparison suggested that capability, professional and process controls were more effective than outcome control and reinforcement. Originality/value: In theory, this study contributes to the burgeoning literature on how to improve the effectiveness of control measures targeted at safety professionals. The results suggested that effective management controls involve a fine combination of formal, informal, process and output controls. In practice, this study uncovers the ways in which managers leverage the efforts of safety professionals in achieving safety goals. Particularly, it informs managers that the control configurations, instead of isolated controls, should be executed to motivate safety professionals.

Item Type: Article
Uncontrolled Keywords: configuration; latent profile analysis; management control; safety professionals
Index terms: personnel, manager, commitment, drawing, survey, career, methodology, configuration, questionnaire, process control, construction safety, outcome control, subgroup, job satisfaction, reinforcement, effectiveness
Subjects: psychology, practitioner, research management, research methods, building materials, technical documentation, project delivery, data collection methods, control systems, environmental health, systems engineering, performance management, management, professional development
Topics: Human Resources, Design Practice, Organizational Design, Research Practice, Construction Materials, Information Management, Roles and Professions, Quality Management, Project Management, Engineering Principles, Sustainability
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here