Relationship between the building team, procurement methods and project performance

Naoum, S G and Mustapha, F H (1995) Relationship between the building team, procurement methods and project performance. Journal of Construction Procurement, 1(1), pp. 50-63. ISSN 1358-9180

Abstract

This paper presents some findings of a research project on investigating the influence of the building team on project performance. The paper has several assumptions which form the basis for the discussion of the research framework. Foremost, is the assumption that, the procurement method selected for the project effects project performance but not by itself is the only determinate. Characteristics of the building team i.e. the client, designer and the contractor can significantly influence the outcome of the project. Data from 69 case studies were collected to validate this assumption and it was found that, experience of the building team with the building process has significantly influenced the time and cost overruns, as well as the quality standard of the project. On the other hand, pre-construction time and unit cost were more associated with whether the client had selected a management or a traditional form of contract. With regard to speed of construction, this research did not provide enough evidence to conclude that alternative procurement methods can directly shorten the construction time. Construction time was more influenced by the building type and the method of construction.

Item Type: Article
Uncontrolled Keywords: building team, procurement, performance, project management
Index terms: designer, case study, form of contract, cost overrun, procurement method, project performance, pre-construction, unit cost, construction time, quality standard, building team, evidence, project management, building process
Subjects: data collection methods, evaluation and assessment methods, leadership, profession, building construction, financial and cost management, project delivery, contractual arrangements, project controls, project management theory and practice, quality assurance
Topics: Procurement, Human Resources, Time Control, Cost Management, Research Practice, Site Management, Roles and Professions, Project Management, Quality Management
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here