Construction planning models: A review of history, capabilities and limitations

Aouad, G F; Kawooya, A A O and Price, A D F (1996) Construction planning models: A review of history, capabilities and limitations. Journal of Construction Procurement, 2(2), pp. 19-37. ISSN 1358-9180

Abstract

The various construction planning models developed by researchers and practitioners since the beginning of this century are critically reviewed. The aim is to present an up to date review of construction planning models. The review provides a useful one stop reference for researchers during the early stages of related research, and practitioners wishing to evaluate their systems. Current construction planning developments are described and contractors' opinions regarding these developments commented on. This review is mainly based on current literature relating to different planning systems. In order to illustrate current planning practices within construction management, the review has included some of the results of a questionnaire survey conducted amongst the top 400 contractors in USA and top 100 contractors in UK. The review concludes that there is a wide variety of planning models, used by the Architecture-Engineering-Construction (AEC) industry, which range from simple techniques such as bar charts to sophisticated and complex models such as expert systems, simulation programs, CAD-based planning applications and integrated planning models.

Item Type: Article
Uncontrolled Keywords: construction planning, integration, project management, scheduling
Index terms: history, program, integration, questionnaire, practitioner, expert system, survey, scheduling, project management, construction planning
Subjects: software systems, project management theory and practice, data management, organizational analysis, data collection methods, construction planning, architectural and construction history, practitioner, operations research
Topics: Project Management, Research Practice, Roles and Professions, Digital Applications, Time Control, Site Management, Organizational Design
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here