Davies, R and Harty, C F (2012) Control, surveillance and the 'dark side' of BIM. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Abstract
Various BIM (building information modelling) technologies are increasingly being positioned as a way to improve coordination horizontally across construction disciplines and vertically between design, construction, manufacture and, increasingly, facility management. The arguments for implementing BIM are persuasive, with potentially significant savings in terms of reducing the re-working of information across the supply chain, and reducing the high levels of physical waste generated. They are also now supported by the recent UK government mandate to use BIM on public projects by 2016. But there are other more problematic considerations with the mobilization of integrated information management systems, especially around issues of control, surveillance and power. Primarily drawing on Foucault inspired studies of information systems use and surveillance in this paper we look at some of these implications for the division of labour and for control during the construction process. We use empirical material from two longitudinal case studies of BIM implementation; a new airport terminal and two large PFI hospitals, both in the UK. We draw out the issues around the potential and limitations of this technology as a method of imposing control across disciplines and down the supply chain. Whether these technological change initiatives are initially intended to be an instrument of leveraging control over other actors is difficult to ascertain, but our empirical evidence shows that negotiations over who has the power to enforce or resist the technology and processes supporting it are fundamental in shaping how implementation plays out.
| Item Type: | Conference Paper (Paper) |
|---|---|
| Uncontrolled Keywords: | BIM; control; ICT; labour; power; resistance; surveillance |
| Index terms: | surveillance, evidence, management system, division of labour, case study, mandate, implementation, savings, public project, drawing, information system, negotiation, technological change, construction process, coordination, building information modelling |
| Subjects: | business economics, infrastructure engineering, economic analysis, innovation studies, conflict resolution, technical documentation, data collection methods, contractual arrangements, monitoring and control systems, management, building construction, evaluation and assessment methods, political science, information systems |
| Topics: | Digital Applications, Procurement, Site Management, Research Practice, Engineering Principles, Governance, Business Strategy, Design Practice, Organizational Design, Stakeholder Management |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here