Moore, D R and Dainty, A R J (2000) Work-group communication patterns in design and build project teams: An investigative framework. Journal of Construction Procurement, 6(1), pp. 44-55. ISSN 1358-9180
Abstract
The manner of a work-groups' response to unexpected variations (change instructions) under UK design and build (D&B) arrangements is generally seen as being governed by the single point responsibility that this form of procurement promotes. Moreover, the task-oriented management structures which would be expected of the construction phase of this type of contract are typically focused upon the production process. However, these perceptions rely upon the supposition that communicative interfaces have little influence within such project environments, regardless of the level of synergy that the work-group has attained. Previous research has not informed the industry as to whether that is the case, as it has focused on the relationship of the end product with value for money, and not the formative aspects of the D&B process. This paper presents a research framework which takes a human focused perspective on D&B work-group efficiency. It suggests potential communication pattern problems within design and build work-groups, and specifically those resulting from change instructions imposed by clients. A range of potential barriers are identified, which suggest a need for a wider study examining intra work-group cultures across a range of D&B project scenarios. An innovative methodology is put forward for such a study based on a 'systems theory' approach. Its focus is on establishing the different perspectives, attitudes and behaviours of the work-group members in responding to change. By taking an holistic view of work-group interaction, it explores the professional, communicative and attitudinal interfaces that have a detrimental effect on information flow and problem solving efficiency.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | design and build, work-group efficiency, change instructions, professional cultures, intra-work-group conflict |
| Index terms: | efficiency, interaction, construction phase, synergy, project team, information flow, production process, systems theory, value-for-money, design and build, variation, methodology, problem solving |
| Subjects: | project delivery, partnership management, information systems, performance management, contractual condition, contractual arrangements, behavioral psychology, manufacturing engineering, theoretical framing, decision-making and reasoning, research methods, evaluation |
| Topics: | Stakeholder Management, Research Practice, Contract Administration, Digital Applications, Procurement, Project Management, Engineering Principles, Quality Management, Value Management |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here