Kashiwagi, D T and Byfield, R (2002) Project MA Case study of potential impact of subjective decision making on construction performance. Journal of Construction Procurement, 8(2), pp. 101-116. ISSN 1358-9180
Abstract
The construction industry has a poor performance record (on time, on budget, and meeting owner expectation) This paper proposes that the reason for poor construction performance is a lack of performance information and poor practices, such as user and designer subjective decision making and resulting attempted control of the contractor. The paper introduces the Information Measurement Theory (IMT) to explain the hypothesis. IMT is the measurement of information to minimize the risk of non-performance. IMT states that the owner's subjective expertise and decision making as a factor affecting the level of construction performance. The hypothesis was tested using the Performance Information Procurement System (PIPS) on the procurement of the $2.96 million Bridgerland Academic Training Centre (ATC) for the State of Utah's Division of Facilities Construction Management (DFCM). The artificial intelligent (AI), information based PIPS, was run two ways; selection with biased subjectivity, similar to current low bid processes, and selection without biased subjectivity. Unlike other processes, PIPS minimizes the decision making and subjective bias of the owner's representatives. The procurement test at Brdgerland ATC provides a comparison between a minimized bias selection vs. a user agency's subjective decision making prioritisation. The user then quantifies the differential based on past construction performance and the results of the information based procurement. The results of the information based system were successful. Although the conclusions are preliminary and based on one case study, the results are in agreement with other ongoing tests. The research paper describes the development of the hypothesis to minimize subjectivity, the test of the hypothesis, the results, conclusions and recommendations.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | nonbiased best value procurement |
| Index terms: | subjectivity, research paper, agency, bias, decision-making, designer, owner, construction performance, case study, construction industry, procurement system, best value procurement |
| Subjects: | decision analysis, sociology, industry analysis, probability and distributions, performance assessment, data collection methods, profession, tendering, contractual arrangements, research dissemination and communication, human factors and perception |
| Topics: | Site Management, Stakeholder Management, Roles and Professions, Information Management, Research Practice, Procurement, Risk Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here