Chao, Q; Rotimi, F E and Rotimi, J O B (2021) International construction joint ventures as a resourcing model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(1), pp. 28-37. ISSN 17514304
Abstract
Shortages in materials, skilled labour and equipment are well known within construction industries, and impede performance on ongoing and pipeline projects. This study explores international construction joint ventures (ICJVs) as a resourcing model that could relieve pressures within the New Zealand (NZ) construction industry. The study goes further to identify the risks and constraints associated with ICJVs. There is a dearth of literature on the role of ICJVs and their impact on the industry within the context of resource acquisition. The data for this study were collected by way of the administration of an online questionnaire survey to a representative sample of contractors, developers and consultants. A simple descriptive method of analysis was employed for ease of understanding. The study established that materials and labour were the most demanding resources that ICJVs could help address in NZ. Risks associated with compliance with local regulations and certification requirements and those related to lead times were the most critical constraints for international material acquisition. The study findings also indicate that language and communication barriers and differences in the practice of rules and regulations were the most significant constraints for utilising international skilled labour.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction; international joint ventures; New Zealand; resourcing |
| Index terms: | skilled labour, compliance, pipeline construction, certification, survey, questionnaire, regulation, shortages, joint venture, New Zealand, acquisition, international construction, lead time, construction industry |
| Subjects: | civil engineering, management, project controls, political science, industry analysis, administrative processes, business, data collection methods, health safety and environment, Geography, strategic management, economic analysis |
| Topics: | International Construction, Human Resources, Time Control, Contract Administration, Research Practice, Business Strategy, Governance, Engineering Principles, Geographical Context, Health and Safety |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here