Providing a model to choose the most appropriate agile method in construction projects

Pouyandeh, F; Golabchi, M and Taghizadeh, K (2022) Providing a model to choose the most appropriate agile method in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(1), pp. 14-27. ISSN 17514304

Abstract

The use of agile methods according to the success criteria that meet the needs of building projects will increase the efficiency of the construction industry. Most previous research has examined the effects of agility application on one of the success metrics or the implementation of a single agile approach, and no research has been found to select an agile method based on success criteria in construction. In this research, by creating a relationship between success criteria and agile methods and adopting a systematic approach, the appropriate technique was selected in accordance with the needs of the construction industry. This research aims to select the appropriate agile method based on the success criteria of construction projects. By conducting a thorough literature review, a longlist of success criteria and most common agile methods in construction was identified. Then, using the Delphi technique, the most critical criteria were extracted. Additionally, by employing the analytic hierarchy process method, the most appropriate agile technique was determined and ranked. The results show that Scrum is the most adaptable agile method in the construction industry. Furthermore, the most critical criterion affecting the selection of agile methods was determined to be ‘completion of the project on time’.

Item Type: Article
Uncontrolled Keywords: agile method; construction management; construction projects; planning & scheduling; project management; success criteria
Index terms: implementation, construction industry, project management, efficiency, construction project, Delphi technique, success criteria, scheduling, literature review
Subjects: contractual arrangements, operations research, assessment methods, production management, data analysis and analytics, data collection methods, industry analysis, project management theory and practice, performance management
Topics: Quality Management, Procurement, Project Management, Time Control, Research Practice
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here