Evaluating social value in the UK construction industry

Cartigny, T and Lord, W (2019) Evaluating social value in the UK construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 8-16. ISSN 17514304

Abstract

A comparative study of contracts tendered in England, Wales and Scotland was conducted to determine the impact of the Public Services (Social Value) Act 2012 ('the Act') on public sector construction contracts. This paper builds on the literature review paper already published by the authors, which set out to define what social value means in the context of public sector works in the UK and under the Act, by assessing the impact on public sector procurement in the UK. A broad method of measurement for social value in public sector construction contracts is developed before reviewing published contracts (tendered and awarded) on the Official Journal of the European Union website. The study has found that the Act has had little impact on England, where social value was already being considered; however, there has been a significant increase in attempts to incorporate social value associated with construction projects in both Wales and Scotland.

Item Type: Article
Uncontrolled Keywords: local government/procurement/social impact
Index terms: Wales, construction project, method of measurement, literature review, journal, local government, public sector procurement, construction industry, social impact, comparative study, Scotland, social value, construction contract, public services, public sector, European Union, England
Subjects: financial and cost management, data analysis and analytics, research design and methodology, industry analysis, administrative law, sociology, contractual arrangements, contract type, research dissemination and communication, Geography, production management, physical geography and landforms
Topics: Cost Management, Research Practice, Urban Studies, Procurement, Project Management, Geographical Context, Legal Issues
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here