Analysis of the influence of a strategy-led planning approach on successful construction project implementation

Rotimi, J O B and Ramanayaka, C D D (2015) Analysis of the influence of a strategy-led planning approach on successful construction project implementation. Construction Economics and Building, 15(2), pp. 13-30. ISSN 2204-9029

Abstract

This paper presents arguments for the development of a strategy-led approach to planning and implementation of construction projects. It takes the position that there are deficiencies in traditional planning algorithms, which make them inefficient to cope with the unique character of construction projects. Thus a combination of construction project strategies crafted from experiential knowledge (reflective practice methodologies) and traditional planning algorithms are needed for successful construction project planning and implementation. To confirm the argument, the study investigates the influence of strategies on 35 critical success factors which were identified through literature. It uses a combination of data collected through a questionnaire survey of 40 NZIOB Excellence award recipients for the period 2001 to 2011, and interviews with three subject matter experts to validate the influence of the strategy-led approach towards some selected critical success factors. A correlation analysis shows that there is a positive relationship between increasing project complexity and the use of strategies. Further, content analysis of study information collected suggests that complementary approaches herein referred to as the strategy-led approach is needed to achieve successful project outcomes.

Item Type: Article
Uncontrolled Keywords: construction project; planning and scheduling; strategy; led approach
Index terms: survey, project outcome, project complexity, correlation analysis, implementation, critical success factor, content analysis, strategy, reflective practice, scheduling, questionnaire, methodology, construction project, interview
Subjects: operations research, contractual arrangements, data analysis and analytics, statistical analysis, data collection methods, management, research methods, project completion, production management, organizational theory, professional development, control systems
Topics: Time Control, Project Management, Research Practice, Information Management, Business Strategy, Procurement
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here