A study of non-compliance with quality requirements in Uganda

Kakitahi, J M; Alinaitwe, H M; Landin, A and Mudaaki, S P (2015) A study of non-compliance with quality requirements in Uganda. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(1), pp. 22-42. ISSN 17514304

Abstract

Quality failures in public building construction are increasingly being noted, partly due to the prevailing environments in which contractors are selected on lowest bid prices, but also because the initiatives of certifying quality-compliant companies are mainly used for the enhancement of a company's public image for marketing purposes. This problem is further compounded because these projects are prone to 'graft' and other undesirable individualistic characteristics that exist within a construction project organisational setting. The primary aim of the research was to determine causal factors, examine derivative impacts and propose mitigation measures for noncompliance to quality requirements. A questionnaire survey approach was adopted and appropriate statistical analyses conducted. Responses to the causality factors, derivative impacts and mitigation measures were then analysed. The three strong causality factors were inadequate communication, graft and dishonesty. Safety failures, increased building maintenance costs and reduction in building lifespan were identified as the three strong derivative impacts. The three strong plausible mitigation measures were stringent action on public sector graft, increased quality testing of materials and improved procurement practices. The research highlights the need for best practices that encourage a whole-life value philosophy and the curbing of graft in public sector procurement.

Item Type: Article
Uncontrolled Keywords: developing countries; project management; quality control
Index terms: developing country, compliance, building maintenance, public sector procurement, survey, philosophy, construction project, questionnaire, mitigation, building lifespan, public building construction, public sector, statistical analysis, best practice, marketing, quality control, testing, project management, Uganda
Subjects: project management theory and practice, administrative law, philosophical studies, data collection methods, business, data science, project delivery, production management, Geography, health safety and environment, development economics, financial risk, building construction, asset management, construction type, professional practice, contractual arrangements
Topics: Procurement, Engineering Principles, Geographical Context, Project Management, Health and Safety, Quality Management, Legal Issues, Construction Technology, Research Practice, Cost Management, Business Strategy, International Construction, Design Practice
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here