Building information modelling: moving Crossrail, UK, forward

Smith, S (2014) Building information modelling: moving Crossrail, UK, forward. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(3), pp. 141-151. ISSN 17514304

Abstract

The data management foundations for the Crossrail railway project in London, UK were established in 2007, a full 4 years before the UK government construction strategy (GCS) paper which required all major UK government construction projects to be fully working in collaborative three-dimensional building information modelling, with all project and asset information, documentation and data being electronic, by 2016. Building on lessons learned from predecessor projects such as High Speed 1, Crossrail's approach to technical information was founded on similar principles to those outlined by the UK government consturction strategy. This project is notable for being the first major European project to use a BS 1192 collaborative working environment with a fully 3D model-based design. This paper provides an overview of the journey taken by Crossrail in setting up its technical information foundation and how this aligns to the subsequent emerging requirements set out by the UK government consturction strategy. Furthermore it outlines how Crossrail has adapted and refined its approach in the light of the strategy and provides lessons learned to date for wider use by the industry.

Item Type: Article
Uncontrolled Keywords: BIM; information technology; railway systems
Index terms: technical information, strategy, documentation, lessons learned, information technology, construction project, London, data management, 3D model, foundations, railway system, building information modelling
Subjects: professional development, information systems, infrastructure and transport systems, data management, production management, management, structural engineering, computing systems, computational design, Geography, technology management
Topics: Engineering Principles, Project Management, Digital Applications, Geographical Context, Business Strategy, Information Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here