Building information modelling in the highways sector: Major projects of the future

Teall, O (2014) Building information modelling in the highways sector: Major projects of the future. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(3), pp. 127-133. ISSN 17514304

Abstract

This paper assesses the current situation and ongoing developments with regards to the use of building information modelling (BIM) tools and processes in major projects by the UK Highways Agency. Using the M25 widening scheme as a case study, it explains the benefits of BIM within the sector as well as the current restrictions to its use. The potential for added benefits through the use of embedded information within BIM models is discussed, as well as the use of BIM tools in the handover process. The A556 improvement project is discussed as a possible demonstration project for these added benefits. Current challenges relating to the link between major project BIM tools and highways asset management are identified, and conclusions made as to what more can be done in this area to improve the whole-life management of highways assets.

Item Type: Article
Uncontrolled Keywords: information technology; roads & highways
Index terms: case study, building information modelling, major project, asset management, improvement project, information technology, whole-life management, agency
Subjects: data collection methods, computing systems, sociology, information systems, strategic project management, asset management, production management
Topics: Project Management, Digital Applications, Business Strategy, Research Practice
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here