Design and construction of the Gautrain rapid rail link

Andrew, C and Thoms, I M (2012) Design and construction of the Gautrain rapid rail link. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 41-54. ISSN 17514312

Abstract

Public transport in South Africa is being transformed with the advent of the 77 km Gautrain Rapid Rail Link in Gauteng. The first phase was opened on 8 June 2010 and, at the time of writing, the second phase was scheduled to be completed by mid-2011. In September 2006, the Gauteng Provincial Government awarded the ZAR25 billion (£1 billion) project to the Bombela Concession Company on a public-private partnership basis, with the concessionaire obliged to design, build, commission, partly finance, operate and maintain the Gautrain System for 15 years following delivery of the full system. The new railway will relieve traffic congestion on the N3 expressway linking Johannesburg and Pretoria, act as a catalyst for social regeneration of decaying urban areas, stimulate economic development and job creation along the Gautrain corridor and encourage the use of public transport. The system also provides a dedicated premium airport service between Sandton and OR Tambo International Airport, as well as feeder and distribution bus services to stations. This paper describes the scope of the project, the participants and how they interacted, as well as the engineering solutions and methodologies adopted during the design and construction processes. The main challenges of this landmark project, and how these were overcome, also feature in the paper.

Item Type: Article
Uncontrolled Keywords: project management; public–private partnership; railway systems
Index terms: methodology, urban area, South Africa, concessionaire, economic development, public transport, design and construction, railway system, project management, traffic congestion, Johannesburg, partnership
Subjects: project management theory and practice, partnership management, infrastructure and transport systems, contract type, contractual arrangements, economic development, research methods, urban form and morphology, Geography, transportation engineering
Topics: Stakeholder Management, Research Practice, Urban Studies, Sustainability, Procurement, Engineering Principles, Geographical Context, Project Management
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here