Could the NEC be widely used in New Zealand?

Wilkinson, S and Farhi, C (2008) Could the NEC be widely used in New Zealand? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 107-113. ISSN 17514312

Abstract

One of the major changes in the UK construction industry in recent years has been wide adoption of the NEC suite of contracts. The aim of this research was to investigate whether the drivers for change to the NEC are currently present in New Zealand, along with investigation of the value the NEC is likely to add and the factors that will influence the NEC's wider adoption. Senior construction industry players (including clients, consultants and contractors) were surveyed to investigate these research aims. A combination of indepth semi-structured interviews were undertaken initially, followed by an internet-based survey to seek wider consensus on the thoughts, ideas and opinions of the interviewed research sample. The research found that the drivers for change to facilitate the adoption of the NEC are currently not significant in New Zealand construction. The study demonstrated that industry players generally believe the features and principles of the NEC would be beneficial, with project experiences for the most part confirming support for the contract. The conclusion reached by this research is that for wider adoption of the NEC to 'add value' within New Zealand construction, improvements in project management and procurement practices will be required.

Item Type: Article
Uncontrolled Keywords: contracts and law; procurement
Index terms: construction industry, internet, project management, investigation, New Zealand, survey, interview
Subjects: Geography, project management theory and practice, industry analysis, computing systems, data collection methods
Topics: Project Management, Geographical Context, Digital Applications, Research Practice
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here