An unusual case of delayed sulphate attack to concrete floor slabs

Cheetham, D W and Banfill, P F G (1980) An unusual case of delayed sulphate attack to concrete floor slabs. Construction Papers, 1(1), pp. 7-16. ISSN 0144-8587

Abstract

A mathematical model of activity duration is described with which the productive and unproductive elements of operative time may be separately analysed. The analysis suggested is stochastic, taking account of the factors which cause the output of operatives to vary and statistical theories developed to allow the use of currently available data in the analysis of the productive element. Sample calculations are given to demonstrate the use of the model.

Item Type: Article
Index terms: mathematical model, duration, operative
Subjects: project controls, mathematical modelling, practitioner
Topics: Time Control, Roles and Professions, Research Practice
Descriptive scope: 2 CA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here