The role of the architect: Changes of the past, practices of the present, and indications of the future

Burr, K L and Jones, C B (2010) The role of the architect: Changes of the past, practices of the present, and indications of the future. International Journal of Construction Education and Research, 6(2), pp. 122-138. ISSN 1557-8771

Abstract

For centuries, the master builder, the one who was responsible for both the design and the construction of a project, had sufficient design and construction expertise to oversee a project from inception to completion. Eventually, increased complexity required a higher level of specialization, leading to the separation of the designer and the builder. Since that separation, the role of the designer or architect has continued to shift and evolve. The exact role of the architect today is unclear. However, in integrating design and building team efforts the entire construction industry continues to grow and provide new opportunities for advancement. The successful architect of the future could be one who strives to reclaim lost responsibilities, explores new alternative services, and promotes a higher level of collaboration with the build team.

Item Type: Article
Uncontrolled Keywords: architect; construction manager; construction manager at risk; design-bid-build; design-build; general contractor; master builder
Index terms: complexity, collaboration, construction manager, general contractor, builder, design and building, specialization, construction industry, architect, design and construction, construction manager at risk, design-bid-build, designer
Subjects: design process, practitioner, contractual arrangements, management, industry analysis, systems engineering, profession, business
Topics: Organizational Design, Design Practice, Roles and Professions, Business Strategy, Research Practice, Procurement, Engineering Principles
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here