Project management functions for the light industrial sector in Mexico

Villa, J and Ariaratnam, S T (2013) Project management functions for the light industrial sector in Mexico. International Journal of Construction Education and Research, 9(3), pp. 163-182. ISSN 1557-8771

Abstract

This article examines the day-to-day functions performed by Project Managers in the Light Industrial sector of the Mexican construction industry in order to successfully complete their projects. The research investigates the primary activities performed by these professionals to identify those that are more time consuming. The study is based on results of a survey questionnaire and interviews of thirty Project Managers who responded to questions regarding their roles and responsibilities in performing pre-construction, construction and close-out phases of construction projects. The role of attending, organizing or leading meetings was found to remain relatively constant during all three phases consuming approximately 14% of the Project Manager's average weekly time each. Site rounds, report writing, quality issues and financial issues were found to increase as the project progressed from pre-construction to close-out. Planning and scheduling activities and contract review/negotiation, at 24.5% and 20.1% respectively, were found to consume the most average weekly time during the pre-construction phase and reduce through subsequent phases. As expected, safety issues (7.4%) and productivity review/improvement (7.1%) reached their peak during the construction phase. The results presented in this article provide an insight into the roles and responsibility of Project Managers in the Mexican Light Industrial industry.

Item Type: Article
Uncontrolled Keywords: light industrial; Mexico; project management
Index terms: project manager, productivity, pre-construction, quality issue, construction industry, construction phase, negotiation, project management, interview, scheduling, safety issue, survey, Mexico, construction project, questionnaire
Subjects: operations research, financial risk, production management, Geography, quality assurance, data collection methods, profession, project delivery, project management theory and practice, management, industry analysis, conflict resolution
Topics: Quality Management, Geographical Context, Project Management, Time Control, Roles and Professions, Stakeholder Management, Business Strategy, Cost Management, Research Practice
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here