Ogunlana, S O; Bhokha, S and Pinnemitr, N (2001) Application of artifical neural network (ANN) to forecast construction cost of buildings at the pre-design stage. Journal of Financial Management of Property and Construction, 6(3), pp. 179-192. ISSN 1366-4387
Abstract
The application of artifical neural network (ANN) to forecast the construction cost of buildings at the pre-design stage is described in the paper. A three-layered back-propagation (BP) network consisting of 12 input nodes has been developed. Ten binary input nodes represent basic building features and two real-value inputs represent price indices of major construction materials. The input nodes are fully connectred to three output nodes through hidden nodes. The network was implemented on a Pentium-150 based microcomputer using a neuro-computer program written in the C++ language. Generalised Data Rule (GDR) was used as the learning algorithm. One hundred and thiry-six buildings built during the period 1987-1995 in the Greater Banhkok area were used to train and test the network; the sample being split into two equal parts for training and testing. The determination of the optimum number of hidden nodes, learning rate, and momentum were based on trial-and-error. The best network was found to consist of six hidden nodes, with learning rate of 0.6, and null momentum. It was trained for 25,970 epochs within 668 seconds such that the mean squared error (MSE) of the training and test samples were reduced to 9.13 x 10(power -6), and 4.35 x 10(power -5), respectively. The network can forecast construction cost at the pre-design stage with an average error of 4.4%.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | artificial neural network, back-propagation, cost estimating, Generalised Data Rule, pre-design stage, supervised training and testing |
| Index terms: | testing, construction material, computer program, cost estimating, artificial neural network, design stage, neural network, learning algorithm, construction cost, propagation |
| Subjects: | artificial intelligence, modelling and simulation, algorithms, engineering process, building materials, software systems, professional practice, financial and cost management |
| Topics: | Cost Management, Research Practice, Digital Applications, Design Practice, Engineering Principles |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here