Determining the delay factors for reconstructed mega-project’s phases and the associated challenges

Al Khatib, B A (2021) Determining the delay factors for reconstructed mega-project’s phases and the associated challenges. PhD thesis, University of Malaya, Malaysia.

Abstract

In recent decades, the construction industry has developed rapidly. Delays in construction projects are a common phenomenon throughout industry. It was and remains one of the most important challenges negatively affecting not only this industry but also the economy. Many studies were conducted to identify the delay factors in new construction projects in different regions, but very few have focused on finding an explanation for the delay causes in reconstruction projects. The study aims to conduct a comprehensive analysis of the delay factors in mega reconstruction projects which took place recently in the Middle East, namely Mataf Expansion Project in Mecca, Saudi Arabia. This project consists of two main parts, nonhistorical and historical and it clarifies the difficulties facing this type of reconstruction projects, which combine demolition and construction works at the same time while the project is under operation. In order to achieve the study goal, twenty-nine interviews were held with the experts working on the project to identify the delay factors and ninety-three questionnaires were distributed by hand to sort them. The results showed that these factors could be divided into three groups: the first one is related to the demolition phase and the second is related to construction phase, while the last is related to overall reconstruction duration. In addition, it has been observed that the materials challenges are considered the major delay factor in the historical building of this project. The questionnaire results were analyzed and delay factors were sorted in a descending order according to the relative importance index (RII). The three main factors affecting the overall reconstruction project duration were site conditions and constraints, electrical and mechanical rerouting works, and design constructability and modification. Finally, recommendations were provided to bridge or reduce the negative impacts of the delay factors in future reconstruction projects.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: Middle East; Saudi Arabia; bridge; constructability; construction phase; duration; mega-project
Index terms: construction work, constructability, construction phase, construction industry, duration, Saudi Arabia, reconstruction, questionnaire, construction project, historical building, interview, Middle East, relative importance index
Subjects: industry analysis, project controls, construction integration, project delivery, risk assessment, data collection methods, building construction, Geography, production management, physical geography and landforms, operations management, construction type
Topics: Research Practice, Construction Technology, Design Practice, Time Control, Engineering Principles, Project Management, Geographical Context, Risk Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here