Atkin, B L (1988) Time-cost planning of construction. PhD thesis, University of Reading, UK.
Abstract
For many building clients, time is money. This thesis proposes a technique which models the construction costs and times of design options, enabling the relationship between them to be explored. The research reveals problems associated with current design practice and investigates design decision-making. Results of a survey reveal the frequency with which different design options occur on office buildings and the extent to which designs might be regarded as stereotyped. The research also investigates cost planning theory and practice and, particularly, the extent to which it takes account of the construction process. Quantity surveyors' perceptions, at early design, of the comparative construction costs and times of design options are measured. The contribution that construction planning might make to cost planning is considered. Various techniques are investigated, and Decision Critical Path Method and deterministic dynamic programming are proposed as the basis of a time-cost planning technique. Several algorithms are developed and incorporated into a computer-based optimisation model: the model is used to test the sufficiency of the technique. Results show that the technique is able to guide the decision-making of the designer, at early design, with respect to the most appropriate selection of design options.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Uncontrolled Keywords: | construction planning; cost planning; critical path method; design decision; design practice; designer; optimisation; programming |
| Index terms: | survey, cost planning, design decision, critical path method, construction process, decision-making, programming, construction cost, designer, office building, quantity surveying, design practice, construction planning, option, dynamic programming |
| Subjects: | programming, construction type, operations research, design process, algorithms, building construction, data collection methods, profession, financial and cost management, construction planning, design practice, financial management, decision analysis |
| Topics: | Risk Management, Time Control, Site Management, Design Practice, Digital Applications, Roles and Professions, Construction Technology, Cost Management, Research Practice |
| Descriptive scope: | 3 PCE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here