Choi, K C (1992) An object-oriented historical cost information base to support concurrent engineering. PhD thesis, University of California, Berkeley, USA.
Abstract
The importance of conceptual planning in achieving overall cost effectiveness of engineering-construction project is well recognized. There are problems with the conceptual planning process though. One such problem is the lack of integration between design and project control systems. This results in a sequential cost optimization process, which is time consuming and ineffective for fast-tracked process plant projects. A concurrent engineering approach is explored in this dissertation as a way to improve the conceptual planning effectiveness. To support concurrent planning, a new historical cost information model is developed in this research. Based on extensive user interviews, this research developed a complete set of system functional specifications, a portion of which was implemented in a prototype object-oriented historical information base, called IBIS. IBIS stores the data in data source objects that encapsulate the procedures to perform the following operations: (1) cost allocation, (2) cost aggregation, and (3) cost normalization. Applying these operations to data source objects, IBIS can generate historical cost reports (various cost views) for any object in the information base in response to queries from users. These functionalities are supported by IBIS's ability to build the object references automatically (with pointers and back pointers) as the data objects are created. These pointers also enable IBIS users to navigate through data objects as desired. IBIS has demonstrated that it can support multiple levels of abstraction for different user views effectively by using the object oriented database functionalities. This eliminates the need for storing historical data on paper reports. Finally, the value of IBIS, which supports concurrent planning, was verified by a review panel of industry authorities.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Uncontrolled Keywords: | concurrent engineering; cost information; cost optimization; integration; optimization; project control |
| Index terms: | dissertation, project control, concurrent engineering, effectiveness, database, planning process, cost information, construction project, integration, functionality, prototype, cost-effectivenes, interview, cost optimization, specification |
| Subjects: | organizational analysis, data management, project controls, engineering methods, performance management, economics, contractual condition, modelling and simulation, data collection methods, control systems, accounting and finance, production management, design features, research dissemination and communication |
| Topics: | Quality Management, Project Management, Engineering Principles, Design Practice, Digital Applications, Contract Administration, Time Control, Organizational Design, Research Practice, Cost Management |
| Descriptive scope: | 3 PCE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here