Mapping supply chains for energy retrofit

Wade, F and Han, Y (2024) Mapping supply chains for energy retrofit. Buildings & Cities, 5(1), pp. 388-399. ISSN 2632-6655

Abstract

This paper introduces social network analysis (SNA) to investigate retrofitting supply chains. It tests the approach by studying those undertaking whole-house retrofit of social housing in a case study city. Network visualisations and metrics including network density (overall connectedness), in-degree centrality (support needed to complete a task) and closeness centrality (speed of access to information) are used to compare how communication varies through different retrofit stages. The preliminary results indicate high density networks and strong ties amongst project leaders (the local authority and tier-one contractors), indicating the transfer of tacit, complex information. These project leaders retain a high closeness centrality throughout the retrofitting process, but there is uneven communication, with subcontractors experiencing infrequent communication and connection only to tier-one contractors. This does not necessarily hinder project success, but may indicate missed opportunities for shared learning. Further, as a quantitative mapping technique, SNA alone does not provide insight into the nature of the interactions taking place. The approach introduced here can be strengthened by incorporating analysis of the types of information exchanged and detailed qualitative insight into participants' experiences of communication throughout a single retrofitting project. PRACTICE RELEVANCE This paper develops an SNA approach to map the organisations involved in whole-house retrofitting in the social housing sector. The findings illustrate how patterns of communication change throughout the retrofitting process. The data show close collaboration between the project managers and tier-one contractors at the beginning (project definition) and end (commissioning and monitoring) of the retrofitting project. Tier-one contractors retain closeness to contractors during physical install, but the overall network is dispersed for this stage. For practitioners such as retrofitting project managers, the method can be used to understand how supply chains are coalescing under the PAS2035 standard, and indicate potential points where communication with and amongst contractors could be developed. The method could be powerfully combined with the evaluation of retrofitting outcomes to understand which types of supply chain structure are most effective in delivering successful retrofit.

Item Type: Article
Uncontrolled Keywords: social housing; social network analysis; supply chains; whole-house retrofit
Index terms: subcontractor, mapping, visualization, commissioning, density, social housing, case study, interaction, retrofitting, project success, collaboration, access to information, practitioner, local authority, monitoring, project manager, social network analysis
Subjects: control systems, housing and residential development, social equity, behavioral psychology, project management theory and practice, sociology, profession, data collection methods, practitioner, analytical methods, management, renovation and retrofit, spatial and geospatial analysis, completion, research methods, design practice
Topics: Ethics, Research Practice, Urban Studies, Site Management, Quality Management, Project Management, Organizational Design, Engineering Principles, Stakeholder Management, Design Practice, Roles and Professions
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here