Resilience strengthening paths for precast production management in prefabricated construction

Wang, Z; Shen, Y and Li, K (2025) Resilience strengthening paths for precast production management in prefabricated construction. Journal of Construction Engineering and Management, 151(8): 04025095, ISSN 0733-9364

Abstract

Disturbances are inevitable and ubiquitous in precast production, making the enhancement of production management resilience essential to maintain the production performance suffered from disturbances. However, existing studies have primarily focused on single types of disturbances and strengthened the production resilience from single views, without considering the heterogeneity of disturbances and the multiple capacities of resilience. In this paper, the precast production resilience is first deconstructed according to the temporal characteristics of disturbances, including the capacities of monitoring and alarming, resistance and absorption, emergency response and recovery, and learning and reconstruction. On this basis, the resilience strengthening model for precast production management is proposed to explore the most effective combinations of resilience capacities to respond to various disturbances. In this model, multiple disturbances with different sources, frequencies, and risk levels are considered, and the optimal resilience paths are customized for different disturbance scenarios. Finally, a case study was conducted to illustrate the application of the model. The results show that the resilience enhancement relies on the synergistic interaction among multiple resilience capacities especially for the largest damage disturbances. The capacity of monitoring and alarming is a pivotal element to prevent a wide array of disturbances, while learning and reconstruction is most effective for occasional disturbances. The findings can provide insights for disturbance management in precast production and promote the development of prefabricated construction.

Item Type: Article
Uncontrolled Keywords: disturbance; fuzzy-set qualitative comparative analysis; prefabricated construction; resilience
Index terms: strengthening, production management, qualitative comparative analysis, emergency response, monitoring, interaction, case study, recovery, reconstruction
Subjects: project delivery, control systems, data collection methods, safety engineering, operations management, behavioral psychology, building construction, research methods, structural engineering
Topics: Site Management, Research Practice, Engineering Principles, Project Management, Health and Safety
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here