Pathways of construction dispute formation in China: A DEMATEL, AISM, and MICMAC-based approach

Tian, S; Abdalla, A; Zhang, G; Tang, Y and Cao, X (2025) Pathways of construction dispute formation in China: A DEMATEL, AISM, and MICMAC-based approach. Journal of Construction Engineering and Management, 151(10): 05025013, ISSN 0733-9364

Abstract

Construction disputes, often triggered by a variety of interconnected factors, are widely recognized as a significant challenge within the construction industry, frequently leading to substantial delays and cost overruns. This study aims to clarify the formation path of construction disputes in China. Using judgments published by the Supreme Court of China and arbitration cases published by the arbitration commission as the primary data source, the research employs text-mining techniques and expert interviews to identify the key influencing factors of these disputes. The study utilizes the decision-making trial and evaluation laboratory (DEMATEL) model to rank the causal relationships and the influence magnitude of each factor. Then, the adversarial interpretive structural modeling (AISM) model is applied to establish a hierarchical structure of these factors, providing a comprehensive discussion on the formation path of construction disputes. To validate the analysis, the Matrices Impacts Croises-Multiplication Appliance Classement (MICMAC) model is used to assess the dependence and driving force of the causal factors. The findings reveal that contractual imperfections, poor communication, and the transaction structure does not align with market demand, which are the most fundamental causes of disputes in China's construction sector, while claims emerge as the most direct trigger. The study underscores that construction disputes arise from multiple factors rather than a single issue, offering critical insights for industry stakeholders to mitigate dispute occurrences effectively. Finally, using a novel integrated approach to study the formation pathways of construction disputes supplements the existing body of knowledge and helps minimize the occurrence of construction disputes. All parties involved in construction projects can benefit from the study's findings by understanding the importance of contracts, communication, and the alignment of transaction structures with market demand.

Item Type: Article
Uncontrolled Keywords: adversarial interpretive structural modeling; construction disputes; decision-making trial and evaluation laboratory; formation path; matrices impacts croises-multiplication appliance classement
Index terms: dispute, construction sector, judgment, decision-making, mining, cost overrun, construction dispute, body of knowledge, integrated approach, laboratory, arbitration, influencing factor, interview, construction project, China, interpretive structural modelling, construction industry
Subjects: data analysis and analytics, financial and cost management, dispute resolution, knowledge management, contractual arrangements, decision analysis, Geography, data collection methods, research management, risk assessment, geotechnical engineering, industry analysis, production management
Topics: Cost Management, Project Management, Research Practice, Legal Issues, Engineering Principles, Geographical Context, Procurement, Risk Management, Information Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here